Bedrock Core

Bedrock Core

8-8-13_bedrock core

John (Cascade Drilling) and Garrett (TerraTherm) prepare a core for determining bedrock.

8-8-13

 

Installed to date:

HO-440 (74%)

VEW-428 (78%)

TMP-60 (62%)

PMP-42 (66%)

ISTR- 3 (43%)