Documents and Links

Non-Time-Critical Removal Actions (“NTCRAs”) / Remedial Investigation / Feasibility Study (“RI/FS”) (1993 – 2005)

Type Name Date Size
Icon of NTCRA 1 100% DesignNTCRA 1 100% DesignDec, 199425.3 MB
Icon of NTCRA 1 Demonstration of Compliance PlanNTCRA 1 Demonstration of Compliance PlanJun, 19954.3 MB
Icon of 1998 Remedial Investigation Report Volume 1 1998 Remedial Investigation Report Volume 1 Jun, 199823.8 MB
Icon of 1998 Remedial Investigation Report Volume 2 1998 Remedial Investigation Report Volume 2 Jun, 199832.3 MB
Icon of 1998 EPA Cost and Performance Report on NTCRA 11998 EPA Cost and Performance Report on NTCRA 1Sep, 1998966.1 KB
Icon of NTCRA 2 Technical MemorandumNTCRA 2 Technical MemorandumJul, 19999.9 MB
Icon of NTCRA 2 Demonstration of Compliance PlanNTCRA 2 Demonstration of Compliance PlanNov, 19997.6 MB
Icon of NTCRA 2 100% DesignNTCRA 2 100% DesignNov, 19996.6 MB
Icon of EPA Technology News and Trends (article on delineation of NAPL zone at SRSNE)EPA Technology News and Trends (article on delineation of NAPL zone at SRSNE)Sep, 2004702.1 KB
Icon of 2005 Draft Feasibility Study Report2005 Draft Feasibility Study ReportMay, 200564.9 MB
Icon of EPA Technology News and Trends (article on phytoremediation at SRSNE)EPA Technology News and Trends (article on phytoremediation at SRSNE)May, 20061.4 MB

Remedial Design / Remedial Action (“RD/RA”)
(2008 to present)

Controlling Documents

Type Name Date Size
Icon of RD/RA Consent DecreeRD/RA Consent DecreeOct, 20084.0 MB
Icon of RD/RA CD - Appendix A – Record of DecisionRD/RA CD - Appendix A – Record of DecisionSep, 20056.4 MB
Icon of RD/RA CD - Appendix B - Statement of WorkRD/RA CD - Appendix B - Statement of WorkOct, 20085.0 MB
Icon of RD/RA CD - Appendix C – Site Description / MapRD/RA CD - Appendix C – Site Description / MapMay, 2005151.0 KB
Icon of RD/RA CD - Appendix D – List of Settling DefendantsRD/RA CD - Appendix D – List of Settling DefendantsOct, 200813.8 KB
Icon of RD/RA CD - Appendix E – draft Declaration of Environmental Land Use Restrictions and Grant of EasementRD/RA CD - Appendix E – draft Declaration of Environmental Land Use Restrictions and Grant of EasementJan, 2008479.6 KB
Icon of RD/RA CD - Appendix F – Form of Performance GuaranteeRD/RA CD - Appendix F – Form of Performance GuaranteeOct, 2008603.8 KB

Annual Reports and Five-Year Reviews

Five Year Reviews

Type Name Date Size
Icon of 1st Five-Year Review (2010)1st Five-Year Review (2010)Jan, 201149.0 MB
Icon of 2nd Five-Year Review (2015)2nd Five-Year Review (2015)Sep, 20152.3 MB

Annual Compliance Reports

Type Name Date Size
Icon of 5th Annual State of Compliance Report – 20135th Annual State of Compliance Report – 2013Dec, 201323.5 MB
Icon of 6th Annual State of Compliance Report – 20146th Annual State of Compliance Report – 2014Dec, 201437.9 MB
Icon of 7th Annual State of Compliance Report – 20157th Annual State of Compliance Report – 2015Mar, 201639.7 MB
Icon of 8th Annual State of Compliance Report – 20168th Annual State of Compliance Report – 2016Apr, 201764.1 MB
Icon of 1st Annual State of Compliance Report – 20091st Annual State of Compliance Report – 2009Apr, 20109.8 MB
Icon of 2nd Annual State of Compliance Report – 20102nd Annual State of Compliance Report – 2010Dec, 201112.9 MB
Icon of 3rd Annual State of Compliance Report – 20113rd Annual State of Compliance Report – 2011Jan, 201221.4 MB
Icon of 4th Annual State of Compliance Report – 20124th Annual State of Compliance Report – 2012Dec, 201229.8 MB

RD/RA Work Plans

Type Name Date Size
Icon of RD/RA Work PlanRD/RA Work PlanNov, 201012.1 MB
Icon of RD/RA WP Attachment A Overburden NAPL Delineation PlanRD/RA WP Attachment A Overburden NAPL Delineation PlanApr, 20093.5 MB
Icon of RD/RA WP Attachment B Thermal Treatment Monitoring Plan  RD/RA WP Attachment B Thermal Treatment Monitoring Plan Nov, 20101.6 MB
Icon of RD/RA WP Attachment C Thermal Treatment Performance Criteria Work Plan RD/RA WP Attachment C Thermal Treatment Performance Criteria Work Plan Nov, 20102.1 MB
Icon of RD/RA WP Attachment D Vapor Treatment Needs Evaluation Work Plan RD/RA WP Attachment D Vapor Treatment Needs Evaluation Work Plan Nov, 2010113.9 KB
Icon of RD/RA WP Attachment E System Design Evaluation Work PlanRD/RA WP Attachment E System Design Evaluation Work PlanNov, 2010180.2 KB
Icon of RD/RA WP Attachment F NAPL Mobilization Assessment and Mitigation Plan RD/RA WP Attachment F NAPL Mobilization Assessment and Mitigation Plan Nov, 2010353.7 KB
Icon of RD/RA WP Attachment G Post-Excavation Confirmatory Sampling PlanRD/RA WP Attachment G Post-Excavation Confirmatory Sampling PlanNov, 2010589.8 KB
Icon of RD/RA WP Attachment H Habitat Restoration Work PlanRD/RA WP Attachment H Habitat Restoration Work PlanNov, 2010856.7 KB
Icon of RD/RA WP Attachment I Soil Investigation Plan RD/RA WP Attachment I Soil Investigation Plan Apr, 20092.2 MB
Icon of RD/RA WP Attachment J Vapor Control System Evaluation RD/RA WP Attachment J Vapor Control System Evaluation Nov, 2010411.7 KB
Icon of RD/RA WP Attachment K Vapor Intrusion Study Work Plan RD/RA WP Attachment K Vapor Intrusion Study Work Plan Apr, 200995.4 KB
Icon of RD/RA WP Attachment L Monitored Natural Attenuation PlanRD/RA WP Attachment L Monitored Natural Attenuation PlanNov, 20104.2 MB
Icon of RD/RA WP Attachment M Pre-ISTR Preparation Plan RD/RA WP Attachment M Pre-ISTR Preparation Plan Apr, 20092.6 MB
Icon of RD/RA WP Attachment N Monitoring Well Network Evaluation and Groundwater Monitoring ProgramRD/RA WP Attachment N Monitoring Well Network Evaluation and Groundwater Monitoring ProgramNov, 20101.5 MB
Icon of RD/RA WP Attachment O Groundwater Containment and Treatment Evaluation and  Optimization Study Work PlanRD/RA WP Attachment O Groundwater Containment and Treatment Evaluation and Optimization Study Work PlanNov, 2010100.9 KB

RD/RA POP

Type Name Date Size
Icon of RD Project Operations Plan (POP)RD Project Operations Plan (POP)Nov, 2010208.2 KB
Icon of RD POP Attachment A – Site Management PlanRD POP Attachment A – Site Management PlanNov, 20103.7 MB
Icon of RD POP Attachment B – Field SamplingRD POP Attachment B – Field SamplingMay, 20109.3 MB
Icon of RD POP Attachment C – Quality Assurance Project PlanRD POP Attachment C – Quality Assurance Project PlanNov, 20104.5 MB
Icon of RD POP Attachment D – Health and Safety Plan RD POP Attachment D – Health and Safety Plan Nov, 20107.5 MB
Icon of RD POP Attachment E – Community Relations Support Plan RD POP Attachment E – Community Relations Support Plan Sep, 2010211.3 KB

Remedial Design Documents

Type Name Date Size
Icon of Pre-InSitu Thermal Remediation Preparation (PIPP)Pre-InSitu Thermal Remediation Preparation (PIPP)Apr, 20101.9 MB
Icon of Updates to the Existing MODFLOW Groundwater Flow ModelUpdates to the Existing MODFLOW Groundwater Flow ModelJan, 20117.7 MB
Icon of ISTRC Conceptual Design and Remedial Action Work PlanISTRC Conceptual Design and Remedial Action Work PlanApr, 201016.1 MB
Icon of Air Permit Equivalency Application Cover LetterAir Permit Equivalency Application Cover LetterJul, 201026.9 KB
Icon of Air Permit Equivalency ApplicationAir Permit Equivalency ApplicationJul, 20107.0 MB

In Situ Thermal Remediation RAWP and POP

Type Name Date Size
Icon of ISTR RA Report Approval Memo from EPAISTR RA Report Approval Memo from EPASep, 2015564.9 KB
Icon of In Situ Thermal Remediation Remedial Action Work Plan And POPIn Situ Thermal Remediation Remedial Action Work Plan And POPMay, 20141.7 MB
Icon of Appendix A - HAZOP And Constructability ReviewAppendix A - HAZOP And Constructability ReviewJun, 20113.3 MB
Icon of Appendix B - Pre-Design StudiesAppendix B - Pre-Design StudiesApr, 20108.5 MB
Icon of Appendix C - Design DrawingsAppendix C - Design DrawingsJul, 20134.5 MB
Icon of Appendix E - SOPsAppendix E - SOPsApr, 20131.1 MB
Icon of Appendix F - HASPAppendix F - HASPApr, 20102.4 MB
Icon of Appendix G -Thermal Wellfield Implementation Support PlanAppendix G -Thermal Wellfield Implementation Support PlanDec, 20136.0 MB
Icon of Appendix H - Typical Equipment SpecificationsAppendix H - Typical Equipment SpecificationsJul, 20111.0 MB
Icon of Appendix I - Permit Equivalencies And ApplicationAppendix I - Permit Equivalencies And ApplicationOct, 20105.7 MB
Icon of Appendix J - SPCCAppendix J - SPCCApr, 2011965.8 KB
Icon of Appendix K - SRSNE ERPAppendix K - SRSNE ERPMay, 20143.3 MB

In Situ Thermal Remediation Final Report

Type Name Date Size
Icon of Att A - Summary Of Boring DepthsAtt A - Summary Of Boring DepthsApr, 201780.6 KB
Icon of Att B - As-Built Drawings 11x17 FINALAtt B - As-Built Drawings 11x17 FINALApr, 20174.6 MB
Icon of Att C - Detailed Description Of ISTR SystemAtt C - Detailed Description Of ISTR SystemApr, 201778.7 KB
Icon of Att D - TT Weekly ISTR Summary RptsAtt D - TT Weekly ISTR Summary RptsApr, 201723.0 MB
Icon of Att E - FINAL - SRSNE Root Cause Analysis MemoAtt E - FINAL - SRSNE Root Cause Analysis MemoApr, 20171.0 MB
Icon of Att F - SRSNE ISTR Shutdown Report Complete 4 6 15Att F - SRSNE ISTR Shutdown Report Complete 4 6 15Apr, 20177.5 MB
Icon of Att G - Manifest Summary Certs Of DisposalAtt G - Manifest Summary Certs Of DisposalApr, 20174.3 MB
Icon of Att H - Monthly Progress And IQAT RptsAtt H - Monthly Progress And IQAT RptsApr, 201712.0 MB
Icon of Att I - Weekly Meeting Agenda And MinutesAtt I - Weekly Meeting Agenda And MinutesApr, 20175.8 MB
Icon of ISTR Construction Completion Report Text And Figure 091815ISTR Construction Completion Report Text And Figure 091815Apr, 20172.7 MB

RCRA Cap Design

Type Name Date Size
Icon of SRSNE RCRA Cap 100pct Design Report FINAL 101916SRSNE RCRA Cap 100pct Design Report FINAL 101916Apr, 201727.2 MB
Icon of SRSNE RCRA Cap Construction RAWP Final 100pct 101916SRSNE RCRA Cap Construction RAWP Final 100pct 101916Apr, 20172.1 MB

SRSNE Conceptual Site Model

Type Name Date Size
Icon of SRSNE Draft CSM Update 042715SRSNE Draft CSM Update 042715Apr, 201717.4 MB

Vapor Intrusion Study

Type Name Date Size
Icon of SRSNE Vapor Intrusion Study Tech MemoSRSNE Vapor Intrusion Study Tech MemoDec, 2011392.6 KB
Icon of Vapor Intrusion Study Final Apprvl Ltr May 2012Vapor Intrusion Study Final Apprvl Ltr May 2012May, 2013732.7 KB

Open House Posters 2010

Type Name Date Size
Icon of Open House PostersOpen House PostersJul, 201029.3 MB
Icon of Weston PostersWeston PostersJul, 20103.4 MB
Icon of TerraTherm PostersTerraTherm PostersJul, 20105.3 MB

Open House 2013

Type Name Date Size
Icon of Briefing BookBriefing BookAug, 20138.9 MB
Icon of Open House Posters 2013Open House Posters 2013Sep, 201324.5 MB
Icon of TerraTherm Posters 2013TerraTherm Posters 2013Sep, 20139.4 MB
Icon of Weston Open House Posters 2013Weston Open House Posters 2013Sep, 20132.8 MB

Battelle 2016

Type Name Date Size
Icon of Battelle 2016 - SRSNE CSMBattelle 2016 - SRSNE CSMApr, 20173.7 MB
Icon of Battelle 2016 - SRSNE ISTRBattelle 2016 - SRSNE ISTRApr, 20171.0 MB
Icon of Battelle 2016 - SRSNE Plume Evolution Following ISTRBattelle 2016 - SRSNE Plume Evolution Following ISTRApr, 2017344.6 KB

Links

EPA SRSNE Web Page