Status Update of ISTR Well Installation

Status Update of ISTR Well Installation

6-20-13_pwrpnt

 

Installed to date: 283 (48%) Heater Wells (HO), 280 (51%) Vapor Extraction Wells (VEW), 31 (32%) Temperature Monitoring Points (TMP), and 24 (38%) Pressure Monitoring Points (PMP).