Site Demobilization February to April, 2015

Posted on: May 1st, 2015 by Jon Turner No Comments
De-mobilization from site on Feb. 23, 2015.

De-mobilization from site on Feb. 23, 2015.

De-mobilization from site on March 29, 2015.

De-mobilization from site on March 29, 2015.

De-mobilization from site on March 30, 2015.

De-mobilization from site on March 30, 2015.

De-mobilization from site on April 17, 2015.

De-mobilization from site on April 17, 2015.

De-mobilization from site on April 20, 2015.

De-mobilization from site on April 20, 2015.

De-mobilization from site on April 29, 2015.

De-mobilization from site on April 29, 2015.

In-situ Thermal Remediation Continues

Posted on: September 17th, 2014 by Jon Turner No Comments
Frac tank (mobile steel storage tank) for extra discharge water.

Frac tank (mobile steel storage tank) for extra discharge water.

Repairing the discharge pump on July 31st.

Repairing the discharge pump on July 31st.

Repairs completed to the oxidizer in late August.

Repairs completed to the oxidizer in late August.

July Activities at SRSNE

Posted on: July 31st, 2014 by Jon Turner No Comments
Wellfield piping.

Wellfield piping.

Decanting Light Non-Aqueous Phase Liquids (LNAPL) from the oil/water separator on 7/16/2014

Decanting Light Non-Aqueous Phase Liquids (LNAPL) from the oil/water separator on 7/16/2014

Placing the Geoprobe, using a crane, onto the wellfield to collect soil samples in late July.

Placing the Geoprobe, using a crane, onto the wellfield to collect soil samples in late July.

Geoprobe drilling through the concrete cap for sampling.

Geoprobe drilling through the concrete cap for sampling.

20140728-DSC02850-cooling hot soil samples

Cooling the hot soil samples for logging and containerizing for shipment to laboratory.

ISTR System Operations and Maintenance

Posted on: June 17th, 2014 by Jon Turner No Comments
20140617-DSC02725-collecting hot gw samples

Hot Groundwater Sampling

20140612-DSC02718-maintenance of the wellfield

Maintenance of the well field on June 12th.

20140606-DSC02707-system maintenance

Maintenance of the treatment system on June 6th

 

2014 Comprehensive Groundwater Sampling

Posted on: June 14th, 2014 by Jon Turner No Comments
20140610-DSC02710-annual GW sampling

2014 comprehensive groundwater sampling took place June 9th to June 13th, 2014.

In-Situ Thermal Remediation Begins

Posted on: May 15th, 2014 by Jon Turner No Comments
In-Situ Thermal Remediation Begins on May 15, 2014

In-Situ Thermal Remediation Begins on May 15, 2014

Start-Up to Begin Soon

Posted on: May 2nd, 2014 by Jon Turner No Comments
Start-up soon!

Start-up soon!

Oblique Areial of ISTR from April 29, 2014

Oblique Aerial of ISTR from April 29, 2014

February 2014 Photos

Posted on: March 27th, 2014 by Jon Turner No Comments
Cabling connections to electrical power controllers on Feb 7, 2014

Cabling connections to electrical power controllers on Feb 7, 2014

A snow covered view from SW looking NE on Feb. 10, 2014

A snow covered view from SW looking NE on Feb. 10, 2014

Kicking off the New Year

Posted on: January 31st, 2014 by Jon Turner No Comments
Vapor Treatment System Construction on Jan. 7, 2014

Vapor Treatment System Construction on Jan. 7, 2014

Jan. 21, 2014

Jan. 21, 2014

December 2013

Posted on: January 1st, 2014 by Jon Turner No Comments
Monitoring Well (#4 or 7)

Monitoring Well (#4 of 7)

Vapor monitoring wells on Dec. 13, 2013
Vapor extraction wells on Dec. 13, 2013

View from SW on Dec. 31, 2013.

Piping and cabling installation. View from SW on Dec. 31, 2013.