Drilling Status Update

Drilling Status Update

8-6-13

 

Installed to date:

430 (73%)  Heater Wells (HO)

419 (76%) Vapor Extraction Wells (VEW)

57 (59%) Temperature Monitoring Points (TMP)

PMP- 40 (63%)  Pressure Monitoring Points (PMP)

2 (29%) In-situ Thermal Remediation (ISTR)