Installed to date:
430 (73%) Heater Wells (HO)
419 (76%) Vapor Extraction Wells (VEW)
57 (59%) Temperature Monitoring Points (TMP)
PMP- 40 (63%) Pressure Monitoring Points (PMP)
2 (29%) In-situ Thermal Remediation (ISTR)